How Much Power Comes With Grand Tower Energy Center?
- How much power is there?
- 347 MW of grid headroom at the existing Ameren 138 kV bus, plus up to 640 MW of on-site gas generation potential (air permits required; the seller will support the process).
- What is being built?
- 46 acres are conveyed for two brand-new utility substations (345 / 138 / 69 kV). Ameren: under construction, targeting 2027/28 in-service.
- How much land?
- ±305 contiguous acres, plus 160 additional acres available for expansion, on the Mississippi River in Grand Tower, Jackson County, Illinois.
- What is the price?
- On request · offers by LOI. Full data room available under NDA.
Featured Partner Listing
Illinois · MISO / Ameren Illinois · Mississippi River
Grand Tower Energy Center
A grid-plus-gas power campus on the Mississippi River, positioned for hyperscale and data center development
Grand Tower, Jackson County, Illinois
Grid Headroom
347 MW
At the existing Ameren 138 kV bus
Gas Generation Potential
Up to 640 MW
On-site · air permits required
Core Site
±305 ac
Contiguous acres
Additional Acreage
+160 ac
Available for expansion
Conveyed for 2 New Substations
46 ac
345 / 138 / 69 kV
Price · Offers by LOI
On request
All offers subject to ownership approval
Acreage and power figures per the seller's offering memorandum; buyer to verify.

Investment Highlights
- Grid + self-generation on one site: 347 MW of grid headroom at the existing Ameren 138 kV bus, plus up to 640 MW of on-site gas generation potential; air permitting required for new generation, and the seller will support the process.
- 46 acres conveyed for two brand-new utility substations (345 / 138 / 69 kV). Ameren: under construction, targeting 2027/28 in-service.
- Gas at the fence: NGPL Gulf Coast transmission (16″–30″) serves the site.
- Site will be delivered cleaned and remediated.
- Room to grow: ±305 contiguous acres, plus 160 additional acres available for expansion.
- Water and logistics: Mississippi River frontage with existing intake infrastructure and barge access.
- Fiber and permitting climate: Clearwave fiber backbone at the site perimeter. Jackson County is in NAAQS attainment and has no data center moratorium.
- Full data room (title, ALTA survey, flood, air, environmental, easements, PVcase study) available under NDA.
Grid + Gas on One Site
347 MW of grid headroom + up to 640 MW of on-site gas generation potential + two new 345 / 138 / 69 kV substations targeting 2027/28 in-service.
Contact for Details
Carson Jones
eXp Commercial · Passive Investments
EMAIL Carson.Jones@eXpCommercial.com
PHONE 615-212-5524
Questions Buyers Ask About Grand Tower Energy Center
Acreage and power figures per the seller's offering memorandum; buyer to verify.
How much power does Grand Tower Energy Center have?
347 MW of grid headroom at the existing Ameren 138 kV bus, plus up to 640 MW of on-site gas generation potential. Air permitting is required for new generation, and the seller will support the process. Acreage and power figures are per the seller's offering memorandum; buyer to verify.
What new substations are planned?
46 acres are conveyed for two brand-new utility substations (345 / 138 / 69 kV). Ameren: under construction, targeting 2027/28 in-service.
How big is the site?
±305 contiguous acres for the core site, plus 160 additional acres available for expansion, on the Mississippi River in Grand Tower, Jackson County, Illinois.
Is natural gas available?
Yes. Gas at the fence: NGPL Gulf Coast transmission (16″–30″) serves the site.
What about water, fiber and permitting?
Mississippi River frontage with existing intake infrastructure and barge access. Clearwave fiber backbone at the site perimeter. Jackson County is in NAAQS attainment and has no data center moratorium.
What is the price?
Price on request; offers by LOI. All offers are subject to ownership approval.
How do I get the data room?
The full data room (title, ALTA survey, flood, air, environmental, easements, PVcase study) is available under NDA. Contact Carson Jones at eXp Commercial for details.
Looking Beyond Texas?
Is Texas still the best state for data centers after the ERCOT interconnection pause?
Texas still leads on data center count and incentives, but the path to power has slowed. On August 3, 2026, Gov. Greg Abbott directed the Public Utility Commission of Texas and ERCOT to audit data centers seeking to connect to the ERCOT grid, and projects that fail the audit are to be denied a connection. No deadline was set, and lawmakers are also questioning the state's data center sales tax exemption, which now costs more than $1 billion a year. For a user that needs certainty on power, a site with grid headroom already identified outside ERCOT is worth a look: Grand Tower Energy Center has 347 MW of grid headroom at Ameren's existing 138 kV bus in MISO.
What are the best alternatives to Texas for a large data center?
Power availability is still the deciding factor, so the best alternatives are places that can deliver megawatts on a known timeline. Markets drawing attention include Pennsylvania, the Carolinas, Central Washington, Louisiana, Mississippi, Oklahoma and the TVA region. Southern Illinois belongs on that list: Grand Tower Energy Center pairs 347 MW of grid headroom with up to 640 MW of on-site gas generation potential (air permits required), NGPL gas at the fence, Mississippi River water and ±305 contiguous acres.
Where can you still build a data center without a moratorium?
Moratoriums and local limits on data centers spread through 2026, so the community and county matter as much as the state. Jackson County, Illinois, home of Grand Tower Energy Center, has no data center moratorium and is in NAAQS attainment for air quality, which matters when permitting new gas generation. Buyers should confirm local requirements in diligence.
How do I know if a substation has enough capacity for a data center?
Ask the utility three things: how much offtake capacity is available at the nearest substation, how much of it is already claimed by projects ahead of you in the queue, and which rate class or large-load tariff will apply. At least three dozen states have adopted or proposed large-load tariffs, so the answer affects cost as well as timing. At Grand Tower, the seller's offering memorandum shows 347 MW of grid headroom at the existing Ameren 138 kV bus, and Ameren is building two new 345 / 138 / 69 kV substations on 46 conveyed acres, targeting 2027/28 in-service. Buyer to verify with the utility.
Sources: Texas Tribune; Data Center Knowledge; LandGate.
Selling or buying commercial property? Let's talk.
Brokerage and equity participation for commercial real estate owners, investors, and family offices — worldwide, through the eXp Commercial platform.

Carson Jones
Carson Jones is the host of Carson's Corner: Commercial Real Estate, author of The Red Flag Playbook, a licensed commercial real estate advisor and business broker, and the founder of Passive Investments. With 18 years of experience as an entrepreneur and 12 years specializing in passive investing, Carson works with high-net-worth individuals, family offices, business owners, and sophisticated investors as a broker and principal.
Carson holds a BBA in Finance from Baylor University and his Tennessee commercial real estate license (#382989). He actively pursues acquisition and equity opportunities across the United States and abroad through a worldwide network of qualified buyers, family offices, institutional investors, and top-tier developers.
Listed by Kris R. McGee, eXp Commercial (Dirt Dawg Land Advisory). Broker of Record: Jennifer D. Stein, Jennifer Stein Real Estate, Inc., IL #478027711. Marketed by Carson Jones, eXp Commercial, in cooperation with the listing broker.
This summary is provided for information only and does not constitute an offer to sell or a solicitation of an offer to buy. All information was provided by the listing broker and seller, is deemed reliable but not guaranteed, and is subject to errors, omissions, change of price or terms, prior sale or withdrawal without notice. Acreage, power capacity, zoning, environmental condition and utility availability are approximate or study-level and must be independently verified. Images may be approximate or not to scale. Buyers should conduct their own due diligence with qualified legal, tax, engineering, environmental and utility advisors. Data room access requires an executed NDA. All offers subject to ownership approval.