How Much Power Does a Data Center Need?

Data center capacity is measured in megawatts of IT load, not square feet. AI racks draw 40–130 kW each, so one campus can need 100 MW to over 1 GW.

By ·Passive Investments·
Data Center Site Evaluations

Find Out If Your Property Qualifies.

We typically provide a preliminary site qualification and recommended next steps within 24–48 hours of receiving the necessary property information.

Email CarsonText CarsonWhatsApp

Principal, not just a broker. On the right powered site I invest alongside the owner — equity, joint-venture and land partnerships with my capital partners — instead of only listing it.

Why Representation Matters

On a 50-Acre Powered Site, the Right Broker Can Make a $15 Million Difference

Powered land is one of the most valuable and competitive segments of commercial real estate, but how a property is marketed can dramatically impact its final sale price.

Consider a 50-acre site with access to power:

At $300,000 per acre$15 million
At $600,000 per acre$30 million
Difference$15 million

Scale it to a 100-acre site with access to 50 MW of power and the same pricing spread is $30 million versus $60 million — a $30 million difference in potential sale proceeds.

That’s why creating competition matters. A broker who understands the data center and energy markets can position a property in front of hyperscalers, data center operators, infrastructure investors, and energy developers — creating competitive tension among qualified buyers.

The goal isn’t simply to find a buyer. It’s to create a competitive process that maximizes the property’s value. When millions of dollars are at stake, the right marketing strategy and broker representation can make all the difference.

Per-acre figures are an illustrative pricing range, not a guaranteed valuation. See the pricing disclaimer below.

Quick Answers

What Do Owners Ask After “How Much Power?”

How much land does a data center need?
About 20–50 acres for a single large building and 100–1,000+ acres for a multi-phase hyperscale campus. Contiguous tracts with no roads or easements cutting through them are worth far more than the same acreage in pieces.
How much does powered land cost per acre?
In secondary markets powered land typically prices in the low-to-mid six figures per acre, while Northern Virginia powered land trades at $6 million+ per acre (versus about $4 million for entitled land without power). Power is what moves the number: ground worth about $10,000 an acre without a credible power path can reach six figures per acre once capacity and the utility relationship are secured.
How long does it take to get power to a data center site?
About 4 years on average for a new large-load grid connection in 2026, versus 12–18 months before 2022. Constrained markets such as Northern Virginia run up to ~7 years for 100 MW, while sites with an existing substation or in emerging markets can be energized in 12–24 months.
What does a data center cost per MW to build?
Roughly $10 million to $15 million per MW of critical IT load all-in for most U.S. projects in 2026, and more for liquid-cooled AI halls. JLL puts the 2026 global average at $11.3 million per MW, and Cushman & Wakefield's August 2026 cost guide shows per-MW costs up about 21% since late 2024.
Is Tennessee a good place to build a data center?
Yes — TVA power, water, central geography and a deep stock of industrial land make Tennessee one of the strongest Southeast markets, led by Memphis. TVA's board approved a dedicated data center rate on August 20, 2026 (about a 10% average increase phased in over three years, plus upfront capacity-commitment charges), which makes capacity that is already contracted and energized more valuable.
What does a real powered site look like?
A ±49-acre North Memphis campus with 4.5 MW contracted today, a path to 15 MW on Substation 1 and up to 35 MW across two on-site substations (subject to MLGW/TVA confirmation). Data center use is permitted by right, and it is offered as an unpriced call for offers.

Figures as of October 2026. Sources: JLL 2026 forecast via Datacentres.com; Cushman & Wakefield 2026 Data Center Development Cost Guide; Avison Young via TechTarget (Oct 9, 2026); JLL time-to-power data via ConstructionOwners (Jul 2026); TVA data center rate (Aug 2026). Ranges vary by market, design and timing — verify for a specific site.

Understanding Data Center Power & Megawatts

How Much Power Does a Data Center Need?

Data center capacity is measured not in square feet but in megawatts of critical IT load — the power available to the computing equipment. Understanding that number, and how a site gets it, is the key to understanding the whole asset class.

What Is a Megawatt?

A megawatt (MW) is one million watts, or 1,000 kilowatts. Power measures the rate of energy use at a moment in time. A 100 MW data center can draw up to 100 million watts continuously when fully loaded. A gigawatt (GW) is 1,000 MW — city-scale power, and the frontier of the largest AI campuses.

How Much Power Does Each Type of Data Center Need?

Short answer: 10–50 MW for colocation and enterprise facilities, 100 MW per hyperscale building or phase, and 500 MW to 1 GW+ for AI campuses. AI racks draw 40–130 kW each, versus 5–10 kW for a traditional rack.

Capacity Scale What it represents
10 MW Small / colo A modest colocation facility or one data hall.
50 MW Mid-size A solid single-building deployment; a meaningful new utility load.
100 MW Hyperscale building/phase Tens of thousands of homes' worth of power.
500 MW Major campus Requires dedicated transmission and substation infrastructure.
1 GW Mega-campus City-scale load; often needs new generation, not just new wires.

Why Do AI Data Centers Need So Much More Power?

Short answer: An AI rack draws 40–130 kW or more, roughly 10 times a conventional 5–10 kW rack. Multiply that across thousands of racks and one AI campus needs 100 MW to over 1 GW.

A conventional rack ran 5–10 kW. A rack packed with AI accelerators can draw 40–130 kW or more. Multiply that across thousands of racks and a single AI campus can demand 100 MW to over 1 GW. For the first time in decades, US electricity demand growth is being driven materially by a single new category of customer — which is why power, not land, has become the binding constraint. See Powered Land for Data Centers.

How Long Does It Take to Get Grid Power to a Data Center?

Short answer: About 4 years on average for a new large-load grid connection in 2026, versus 12–18 months before 2022. Constrained markets such as Northern Virginia run up to ~7 years for 100 MW, while sites with an existing substation or in emerging markets can be energized in 12–24 months.

Power reaches a campus through high-voltage transmission (commonly 115, 138, 230, 345, or 500 kV) stepped down at a substation. To connect large new load, a project enters the utility's interconnection queue and undergoes studies that determine upgrades and cost allocation — a process now badly congested, with multi-year waits common. This is why sites with existing substation and transmission capacity, like brownfields and retired coal plants, are so valuable.

Can a Data Center Generate Its Own Power?

Short answer: Yes — where a gas pipeline is nearby, on-site turbines or engines can bring large blocks of power online years sooner than a congested grid queue. Nuclear co-location and small modular reactors are coming, but mostly as a next-decade option.

Because the grid is slow, developers increasingly build power on-site. On-site natural gas turbines can bring large blocks online quickly where pipelines exist, and nuclear — co-location and future small modular reactors (SMRs) — is emerging for large, firm, carbon-free power. At gigawatt scale, a campus is an energy project as much as a real estate project: the power is built, not merely found.

Frequently Asked Questions

How much power does a data center use?
Anywhere from under 1 MW for small edge or enterprise sites to 50 to 150 MW for a hyperscale building or phase, up to 500 MW to over 1 GW for large AI and cloud mega-campuses. AI workloads have pushed per-facility power far higher than the prior cloud-era norm.
What is a megawatt?
A megawatt is one million watts of power, or 1,000 kilowatts. In data centers, capacity is described in megawatts of critical IT load — the power available to the computing equipment. A 100 MW data center can draw up to 100 million watts continuously when fully loaded.
How many homes does a megawatt power?
As a rough rule of thumb, 1 MW of continuous power serves on the order of several hundred to about a thousand average US homes, depending on region and how the figure is calculated. A common shorthand is roughly 750 to 1,000 homes per MW.
What is an interconnection queue and why is it backed up?
It is the line of projects waiting for the studies and approvals needed to connect new load or generation to the grid. Queues have congested because demand has outpaced the studies, transmission upgrades, and utility capacity needed to process and serve it, producing multi-year waits in many regions.
Can data centers be powered by natural gas or nuclear?
Yes. On-site natural gas can bring large blocks of power online quickly where pipelines exist, serving as a bridge past congested queues. Nuclear — co-location at existing plants and future small modular reactors — is emerging for large, firm, carbon-free power, with several major operators signing nuclear-related deals.

Need to know if your site can deliver the megawatts?

Carson Jones can help you read the utility, transmission, and substation picture for a parcel. Get a confidential site read or visit Passive Investments.

Educational information only — not legal, tax, engineering, or investment advice.

Work With Carson

Selling or buying commercial property? Let's talk.

Brokerage and equity participation for commercial real estate owners, investors, and family offices — worldwide, through the eXp Commercial platform.

Email CarsonCall 615-212-5524Text Carson
Carson Jones

Carson Jones

Founder · Passive Investments · eXp Commercial

Carson Jones is the host of Carson's Corner: Commercial Real Estate, author of The Red Flag Playbook, a licensed commercial real estate advisor and business broker, and the founder of Passive Investments. With 18 years of experience as an entrepreneur and 12 years specializing in passive investing, Carson works with high-net-worth individuals, family offices, business owners, and sophisticated investors as a broker and principal.

Carson holds a BBA in Finance from Baylor University and his Tennessee commercial real estate license (#382989). He actively pursues acquisition and equity opportunities across the United States and abroad through a worldwide network of qualified buyers, family offices, institutional investors, and top-tier developers.

This article is for informational and educational purposes only and should not be considered tax, legal, accounting, or investment advice. Tax laws are complex and change frequently. Always consult your CPA, attorney, and financial advisor before making any financial, tax, or investment decisions. All investments and property ownership carry risk, including the potential loss of principal. Carson Jones, Passive Investments, and the author make no guarantees regarding the tax treatment, performance, or outcome of any specific investment strategy described in this article.

Pricing disclaimer. The $300,000–$600,000 per-acre figures used on this page are an illustrative pricing range, not a guaranteed valuation. Actual pricing depends heavily on confirmed power capacity, delivery timelines, utility costs, location, and development readiness.